Skip to content

Help

Help and getting started

Short articles, in the order you will need them, each written from the code that runs the product. Where Safegrows does not do something yet, the article says so.

Getting started

From an empty account to a build quote.

  1. Create an account

    Projects, uploads, fit reports and orders live in it.

    Create an accountRead how to create an account

  2. Start a project

    From a template, a description in words, or your own files.

    New projectRead how to start a project

  3. Add a board and its case

    Upload them, or draw both in the studio so every check can run.

    Your projectsRead how to add a board and its case

  4. Run a fit check

    $19.00 a run, with every line measured.

    Your projectsRead how to run a fit check

  5. Ask for a build quote

    One price for 1 to 50 units, reviewed by the operator.

    Your ordersRead how to ask for a build quote

Signed in, this list shows which steps you have already done.

Every article, in reading order

  1. Sheet H.1
    How Safegrows works, from files to a delivered unit

    The whole path in five steps: your files, the fit check, one price, the operator's review, and a verified shop that builds, tests and ships the unit.

    AnswersDo I get a real thing

    7 sections

  2. Sheet H.2
    The files we accept, and how to export them

    Which board and case files the check reads, what it reads from each, and the export settings in KiCad and in a CAD tool.

    AnswersWill it work with my files

    7 sections

  3. Sheet H.3
    How the studio works

    Start from a template, shape the board and the case around it, look at it in 3D, and let every save become a numbered version.

    AnswersWill it work with my files

    6 sections

  4. Sheet H.4
    What the fit check measures, and how to read a report

    The four measurements, the stamp on each line, every finding the check can return, and what the verdict means.

    AnswersWill it fit

    8 sections

  5. Sheet H.5
    The one price, and why the operator reviews every order

    How the instant estimate is built line by line, what the range means, and what the operator checks before anything is made.

    AnswersWhat does it cost

    6 sections

  6. Sheet H.6
    What happens after you order

    Every stage of a build order, who moves it, how you follow it, and what we can and cannot say about time.

    AnswersDo I get a real thing

    5 sections

  7. Sheet H.7
    What things cost

    What each step costs, how you confirm a fit check, and what happens after you confirm.

    AnswersWhat does it cost

    5 sections

  8. Sheet H.8
    For shops: how the partner path works

    How a shop applies, what the operator checks, how jobs reach a verified shop, and what a shop can see.

    AnswersWho builds it

    7 sections